PROJECT

Development and Application of Models and Guidelines for Decision Making Support to Upgrade and Increase the Existing WWTP Operating Efficiency.

The Project was initiated as a part of the technical assistance component of the Inland Waters Project - Loan 7453/HR.
The Project duration is fifteen months and consists of four different but interconnected and logical phases.

Client: Hrvatske vode, Zagreb

Completion year: 2011

Read more

PROJECT

Sewer system and wastewater treatment of the City of Samobor, Stage I - Sewer system development project.

Project included set up and analysis of the feasible options, techno-economic analysis for selection of the most suitable option for waste water treatment, master plan of the sewer system Feasibility study, CBA, EIA and Application for EU funds. of Samobor agglomeration 49.750 PE.

Client: Komunalac, Samobor

Completion year: 2010


PROJECT

Pilot project of optimization of sewerage and waste water treatment systems on the example of the Town of Čakovec with the conceptual design of the network.

Size of analysed area was 100.000 PE.

Client: Hrvatske vode, Zagreb

Completion year: 2010


PROJECT

Additional sewerage network in the area of Trogir city.

Project consisted of conceptual design preliminary design for location permit issuing, detailed design, tender documentation for the sewerage-construction based on FIDIC Red Book condition for separated sewer network of Trogir city (25.000 PE).

Client: Eko Kaštelanski zaljev, Split

Completion year: 2009


PROJECT

Preliminary design for reconstruction of the WWTP of City Samobor with EIA and design for Location Permit issuing.

Project consisted of conceptual design, preliminary design, design for location permit issuing of the WWTP of City Samobor (44.000 PE) and EIA for sewer system and WWTP Samobor.

Client: Hrvatske vode, Zagreb

Completion year: 2000

PROJECT

Sewer system of Osijek, phase I and II.

Analysis of the existing sewer system based on the hydro-dynamic mathematical model and conducted monitoring, Osijek sewer system master plan including technical-economical analysis of the proposed solution versions.

Client: Vodovod Osijek, Osijek

Completion year: 2003


PROJECT

Optimization of the sewerage system of Zagreb city (POKS) – III phase.

Client: Vodoopskrba i odvodnja Zagreb

Completion year: 2005


PROJECT

Optimization of the sewerage system of Zagreb city (POKS) – II phase.

Client: City office for the development of Zagreb city

Completion year: 1998


PROJECT

Optimization of the sewerage system of Zagreb city (POKS) – I phase.

Client: City office for the development of Zagreb city

Completion year: 1996

We are a proud member of Clean Hydrogen Alliance

Declaration

May 4th 2020 - Coronavirus Global Response International Pledging Event Countdown

Real time flood forecasting for Sava River Basin in Croatia

Continuation of implementation of the pilot project and capacity building for flood forecasting - Sava from Sisak to the border with Republic of Serbia

RECONECT partner

RECONECT project leaflet

Contact

PRONING DHI Ltd. for design, services and trade
Headquarters:
Račkoga 3, 10000 Zagreb, Croatia

Zagreb Office:
Otona Kučere 5, 10000 Zagreb, Croatia
tel. (+385 1) 455-6903, 461-0903, 461-0904
fax. (+385 1) 455-6904

Split Office:
Vukovarska 7, 21000 Split, Croatia
tel. (+385 21) 343-520
fax. (+385 21) 480-114

E-mail: info@proning-dhi.hr